
Coal Mining Flotation Machine, Flotation Unit Used in Small Coal Washing Plant
We have a dedicated product research and development department to continuously improve the products produced, so that our Crusher, shredder blade, shredder is always at the advanced level. We always follow the principle of good quality and customer first to vigorously develop glass production, and we are willing to develop together with customers at home and abroad to create a harmonious and beautiful future! Our company will check every link and strive to provide our best products and services to all customers. Welcome to call and inquire.
Company introduction
Original from Europe from 2002, with over 160 plastic recycling projects currently in operation, G.E.T Recycling gives you a clear advice with a tailor made solution on the basis of your plastics and requirements.
GET is one of your ideal partners in the field of recycling from beginning of negotiation to seeking for best solutions, and from machines manufacturing to after-sales service.
High efficiency at high capacities, high quality standard recycling plant at Reasonable investment, GET recycling equipment and lines support operational excellence and economic performance for each customer.

General Introduction of Zig zag air separator
Air separator
The Zig Zag separator also known as an Air Classifier , is designed to remove light contamination; such as paper, label and dust from the plastic flake or other granular material. Single or multiple tower systems are available dependent on the throughput required. Typically positioned in a recycling line after granulation or dry cleaning operations, an aspirator is used to remove the lighter particles from the main material flow.
The Air Classifier Separator works on the principle of upward vacuum extraction of light contaminating materials by a channel, Into which the mixed material falls. Material enters the Air Classifier Separator via a rotary valve and is distributed evenly between the towers before tumbling down each zig zag chamber. The heavy fraction is removed from a central collection hopper and the light fraction is lifted from the cascading material stream by a counter air flow and transferred to a separating cyclone.
GET 's equipment and machines are designed to be modular, in order to speed up the installation of upgrades as soundproof cabins, filtered aspirations, material transport systems, and more.
Equipment list of Zig zag unit
No. | Item | Specification | Qty. | Reference Picture |
01 | Pneumatic transportation | --Function: feeding the materials into the zig zag unit --Power: 5.5KW --Pipe diameter: ∮159 --Material: carbon steel --Including the required pipeline
| 1 |
|
02 | Feed hopper with forced feeding conveyor | --Function: feeding materials into the zigzag by forced power --Material: stainless steel 304 --Bottom outlet with valve adjustment --Power: 1.5KW
| 1 |
|
03 | Zig zag | --Function: remove light materials from the material ,such as paper , labels . --Material: Carbon steel --Unloader power: 2.2kw -- Blower power: 3KW + 4KW | 1 |
|
04 | Silo | --Function: Collecting the separated light impurities from zig zag ,and keep air balance . --Material: Carbon steel -- Unloader power: 0.75kw Contains all connected pipes | 2 |
|
05 | Electric control cabinet | --Function: used to control the operation of the entire system --Cable containing equipment to control cabinet | 1 |
|
Layout of Zig zag unit
Packaging & Shipping
1. One set of Zig zag unit can be loaded in 1* 40 HQ
2. Usually naked and fixed with packing strap
Delivery time
45 working days after receipt of the down payment (will be combined and tested run in G.E.T factory before shipping).
Guarantee:
12 months (not including wear parts such as knives, screen and belts).
Technical documents
We will offer you all necessary documents, e.g. general layout drawing, electrical diagram and service manual after the contract is executed.
Installation and commissioning
G1. After the machines are delivered to your factory, please notice us and we will send our technicians there for installation and testing.
If necessary ,there will be 1 engineer for installation and testing. For whole project installation and testing, around 1 day is needed.
G2. Meanwhile you’re responsible for preparing all basic infrastructures mentioned above before their arrival.
G3. Our technicians will responsible for on-site installation and testing all machines to meet normal operation requirements.
G4. Meanwhile our technicians will give free training lessons to your operators.
We have many excellent staff members good at marketing, QC, and dealing with kinds of troublesome problem in the production process for Coal Mining Flotation Machine, Flotation Unit Used in Small Coal Washing Plant. With the ultimate goal in our mind, we will definitely seize every opportunity to expand our market and find the right place for us, making our company a most competitive one in its line. We warmly welcome you to contact us and please feel free to contact us.
Previous
Pet Label SeparatorYou Might Also Like
Send Inquiry











